Glossary

What is a bill of materials (BOM)?

A bill of materials (BOM) records the parts, components or materials required for a product or assembly, usually with their quantities and relationships. It can describe different views of the product, such as its engineering design or manufacturing requirements. Revisions and applicability matter because a component list may be valid only for a particular configuration or period.

Representing product composition

A BOM describes what an assembly contains or requires. It can include nested subassemblies, component identifiers, quantities and revision information. Engineering and manufacturing views may organise that composition differently because they support different decisions. The organisation needs a controlled way to keep relevant views aligned and to identify which version applies to the product being designed, built or serviced.

An equipment example

A manufacturer could maintain a BOM for a dosing unit comprising a pump, enclosure, pipework and control components. A design revision may replace one component without changing every other part. The BOM and its change process should identify the affected configuration. A service team looking for a replacement part needs the applicable product version, rather than simply the newest component list available.

BOM, bundle and catalogue information

A commercial bundle groups items into an offer; a BOM describes composition for an engineering, manufacturing or related operational purpose. A PIM may use approved BOM information to prepare spare-parts content or product documentation, while the engineering system retains responsibility for the controlled assembly definition. A flat marketing list of included accessories may omit revisions, quantities or nested relationships, so it should not automatically be treated as an equivalent BOM.

Related terms

Sources and further reading

PIM and PXM services

Explore support for selecting, implementing and improving your PIM.